Substation Extension 150 kV Sukamara
Substation Extension 150 kV Sukamara

Overview
PT Iradat Aman Globalindo executed the 150 kV Sukamara Substation Extension project to reinforce grid capacity and supply reliability in the region. As part of regional power infrastructure development, this project expands the existing substation's switching and bay capacity to accommodate growing electricity demands and enhance overall grid stability.
Project Snapshot
The Challenge
Expanding Substation Capacity in Active High-Voltage Environments
Extending an operational 150 kV substation presents unique technical and safety challenges. The execution required constructing new bay foundations, installing primary high-voltage equipment, and integrating control systems right next to energized high-voltage infrastructure. Minimizing disruption to the existing power grid, maintaining strict safety clearances for heavy civil works, and adhering to PLN’s rigorous commissioning standards required precise planning and risk management.
Our Solution
End-to-End Civil & Electrical EPC Execution
Iradat delivered a comprehensive EPC strategy tailored for high-voltage substation expansion. Our specialized team managed site preparation, structural civil works, gantry and equipment foundation pouring, primary equipment installation (circuit breakers, disconnectors, instrument transformers), and control wiring. Working in close alignment with PLN operators, we executed seamless integration and secondary testing without compromising the stability of the active grid.
Scope of Work
- Substation Civil & Foundation Works
- Gantry & Equipment Structure Construction
- High-Voltage Primary Equipment Installation
- Control & Protection Panel Integration
- Grounding System & Cable Trenching
- Secondary Wiring, Testing & Commissioning