Overview

PT Iradat Aman Globalindo is delivering one of its largest transmission infrastructure projects through the construction of the high-voltage overhead line 150 kV at Lubuk Linggau, Tebing Tinggi. Working alongside strategic partners, the project strengthens regional electricity distribution and supports the growing energy demands of South Sumatra.

The project demonstrates Iradat's capability to execute complex transmission line construction while maintaining high standards of safety, engineering quality, and project coordination.

Project Snapshot

Specification
Value
Client
PT PLN (Persero) UIP Sumatera Bagian Selatan
Location
South Sumatera
Project Type
Transmission Line Construction
Contract Value
IDR 60.7 Billion
Status
completed
Partnership
Joint Operation with PT Christi Manunggal
Duration
-

The Challenge

Expanding Grid Capacity Across Challenging Terrain

Executing a 150 kV transmission line across South Sumatra posed significant logistical and geographical hurdles, requiring complex tower construction over hilly terrain, vegetated ROW corridors, and precise river crossings under strict safety standards.

Our Solution

Integrated EPC Execution

Iradat delivered an integrated Engineering, Procurement & Construction (EPC) approach from planning through installation and commissioning. Our multidisciplinary team ensured engineering accuracy, construction quality, procurement efficiency, and safety compliance throughout the project lifecycle.

Scope of Work

  • Transmission Tower Construction
  • Conductor Stringing
  • OPGW Installation
  • GSW Installation
  • Insulator Assembly
  • Testing & Commissioning

Contact Us

Planning a Similar Infrastructure Project?

Our engineering team is ready to support your next transmission, substation, or utility infrastructure project with proven EPC expertise.